3.10.1 Registration of Stake Holders .- The following Stake Holders involved in the development activities in the ULB shall register themselves with the Authority, as per the procedure prescribed in Appendix-I
(a) Promoters/ Developers who intend to undertake developments within the jurisdiction of the Authority;
(b) Professionals for preparing plans and details for obtaining sanction from the Authority (as detailed in Appendix-II) and NOCs from different departments (as detailed in Appendix-IV), referred as professionals for drawings;
(c) Professionals who intend to supervise the implementation of various components specified in the plans sanctioned by the Authority, referred as professionals for supervision;
(d) Professionals who are empanelled by the Authority (as detailed in Appendix-I) to certify the constructions / implementations as per the provisions of the approved plans and also to sanction building plans as notified by the Government; and
(e) Contractors or Agencies implementing major components of the developments.
3.10.2 Application for building plan approval.- Every person (Owner or his authorised representative, including Promoter / Developer) who intends to erect, re-erect or make alteration in any place in a building or demolish any building, shall apply in Form-I along with the required
documents (as detailed in Appendix-VI) and payment of necessary fees (as detailed in Appendix-VII) along with all the drawings and details for obtaining building licence prepared by the professionals on record for drawings (as detailed in Appendix- II). The Applicant shall submit Common application containing details of Form-I andForm-II, if applicable, for obtaining the required NOCs, along with the drawings and details for obtaining NOCs from other departments as applicable (as detailed in Appendix-IV) and payment of necessary fees (as detailed in Appendix-VII).
3.10.3 Verification of documents submitted.- The CEO of the Authority shall verify the documents submitted along with the application and if found in order, will accept the application. In case of any discrepancy, an endorsement shall be issued in Form-III to the applicant stating the discrepancy and the applicant may rectify the same and resubmit to the Authority.
3.10.4 Evaluation of Technical details submitted:
(1) If the application is accepted after finding that the documents submitted along with the application are in order, the TPO of the Authority or the empanelled professional or the designated officer notified by the Government shall evaluate the Technical drawing and details submitted by the Applicant, for compliance with the provisions of the Master plan, ZR and Bye-laws and compliance of the conditions incorporated for obtaining NOCs from different departments and submit the evaluation report to the CEO of the Authority, with noting of discrepancy, if any. The CEO shall approve the evaluation report with or without accepting the noting of discrepancy.
(2) In case the noting of discrepancy is accepted by the CEO an endorsement shall be issued in Form-IV to the applicant stating the discrepancy and the concerned professionals on record for drawings may rectify the same and resubmit to the Authority.
3.10.5 Forwarding details to obtain NOCs and issuing NOCs:
(1) If the Technical drawing and details submitted are complying with the provisions of the Zonal Regulations (ZR) of the Master plan, and the requirements for obtaining NOCs from different departments, the CEO of the Authority shall forward the application, technical drawings and details submitted for NOCs to the concerned departments stating the timelines within which the NOCs have to be issued, (as detailed in Appendix-VIII), failing which the NOCs would be deemed to have been issued.
(2) All the respective departments shall verify the drawing and details submitted along with the application of the NOC and if found in order shall issue NOC within the timelines specified in Appendix-VIII, with or without site inspection, as required and forward the NOC to the Authority.
(3) In case of any discrepancy, the concerned department shall issue endorsement to the applicant stating the discrepancy and the concerned professionals on record for preparing the plans for NOC may rectify the same and resubmit to the concerned Department.
3.10.6 Submission of Site Inspection Report
(1) If the Technical drawings and details submitted are accepted by the CEO, CEO of the Authority shall select the Empanelled professional (based on the qualification and competence notified by the Government and the procedure specified in Appendix-V) and inform the Empanelled professional in Form-V to inspect the site and submit Site Inspection Report for approval of site plan.
(2) On receipt of intimation from the Authority, the selected Empanelled professional shall inspect the site and submit site inspection report (as detailed in Appendix-IX) in Form-VI to the Authority, with noting of discrepancy, if any. The CEO of the Authority shall approve the site inspection report.
3.10.7 Action in case of discrepancy in site inspection report..- If the noting of discrepancy in the Site Inspection Report submitted by the Empanelled professional is accepted by the CEO, an endorsement in Form-VII to the applicant stating the discrepancy and the concerned professionals on record for drawings may rectify the same and resubmit to the Authority. The TPO of the Authority shall verify the resubmitted drawings and details for compliance of the noting of discrepancy accepted by the CEO and forward the same to the CEO and the CEO shall accept the same.
3.10.8 Sanctioning of Building Licence
(1) On receipt of all the required NOCs from the concerned departments, or deemed NOCs issued by the Authority (in case NOCs are not issued by the concerned departments within the timelines specified in Appendix-VIII) and all the technical drawings and details accepted by the Authority and the Site Inspection Report being consistent with the details submitted by the applicant, the CEO of the Authority shall sanction the Building Licence within the timelines specified in Appendix-VIII.
(2) The Authority shall intimate the Applicant to pay the required fees (as specified in Appendix-VII for the various NOCs as well as the Building Licence.
(3) The CEO of the Authority shall issue the various NOCs received from the concerned departments and sanction building licence after receiving the required fees from the Applicant.