- Title and commencement.- (1) These Bye-laws may be called the Bengaluru City Corporation Building (Amendment) Bye-laws, 2026.
(1)
(2) They shall come into force from the date of their final publication in the official Gazette.
-
Amendment of Bye-law 3.8; Bye-law 3.9 & Bye-Law 3.10:- In the Bengaluru City Corporation Building Bye-laws- 2003 (hereinafter referred to as the said bye-laws), Bye-law 3.8- Ground Rent; Bye-law 3.9- Ground Rent for high rise buildings and Bye-law 3.10- Exemption of ground rent the entire provision shall be omitted.
-
Amendment to Bye-law 6.0 Deviation during construction:-
Clause (i) under Bye-law no 6.0 shall be substituted as below:-
i) Wherever any construction is in violation/deviation of the sanctioned plan, the Commissioner may, if he considers that the violations / deviations are within the limits specified in Table-2B below in case of (1) the setback to be provided around the building, (2) plot coverage (3) floor area ratio and (4) height of the building and that the demolition under chapter XVII of the Act is not feasible without affecting structural stability, he may regularize such violations/deviations after recording detailed reasons for the same.
Table-2A
Rate of fee & Penalty for not obtaining Plinth Certificate while issue of occupancy certificate
| Sl No | Fee | Rate of fee for issue of occupancy certificate on the guidance value of site, subject to a minimum consideration of Rs.50,000/- per sq.m to be Chargeable for the total built up area of all floors. | |
| Residential | Non Residential (Commercial / Industrial / Other Uses) | ||
| 1 | 2 | 3 | 4 |
| 1 | "Scrutiny Fee" for issue of occupancy certificate | 0.01% | 0.02% |
| 2 | Compounding Fee for construction carried out without obtaining plinth certificate (chargeable for total built up area constructed without obtaining plinth certificate) | 0.06% | 0.08% |
Table-2B
Maximum Condonable limits of Deviation against permissible limits [Subject to provision of minimum Fire Drive way of required width]
| NSol | Type of Building | Maximum Deviation allowed in set back | Maximum a D Clleoovvwieaertdaiog inen | Maximum a Dlleo FvwAiaeRtdio inn | Height of the building n sau bnme (cynbtiooeonrtnsde odf floors) | |
| o b Tnaoc atklall A s Sirdeeetas | Set ba scikde on any | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| Deviation/ violation against the permissible limit | ||||||
| 1. | All buildings of height below 15 m in plots of extent upto 500 Sq.m | 15% | Half of the required set back measured linearly, Provided Deviation in total set back area shall not exceed 15 % | upto set back deviation limits | 15 % | 7.5 % |
| 2 | All buildings of height above / below 15 m in plots of extent above 500 Sq.m | 15% | 15 %(Measured linearly) | 15 % | 5% | 7.5 % |
| 3 | Basement | 15%(except in the side abutting road) | 15%(Measured linearly except the side abutting road). | 15% | - | - |
Note:1) Compounding fee shall be levied as per Table-2C, to condone the deviations within the limits specified in Table-2B.
-
Building sites which are not eligible for availing premium FAR, the deviation in FAR area may be allowed upto 15% and compounding fee shall be levied as per Table-2C.
-
Wherever the setback deviation allowed under Table-2B, amounts to FAR area deviation in excess of the condonable limits specified in Table-2B, such entire deviated FAR area shall be sanctioned by utilizing TDR/Premium FAR only. In case Premium FAR is utilized, charges shall be levied as per Premium FAR Regulations for the entire deviated floor area.
-
The deviation in FAR area allowed as per Table-2B shall be limited to a maximum of 5% of the permissible FAR for buildings which have utilized additional FAR (TDR/ PFAR). Deviation of FAR area in such buildings shall be condoned by levying compounding fee as per Table-2C.
Table-2C
Compounding Fee for condoning Deviations in FAR area
| Sl No | Use of Building | Rate of Compounding fee for Condoning Deviation of FAR in all floors or area of setback infringement in all floors, based on the guidance value of site, subject to a minimum consideration of Rs.50,000/- per sq.m. | |
| Deviations within permissible limits of Zonal regulations | Deviations beyond the permissible limits of Zonal regulations but not exceeding 15% of the permissible limits in case building in plots upto 500 Sq.m and 5 % in case of buildings in plots of extent above 500 Sq.m | ||
| 1 | 2 | 3 | 4 |
| 1 | Residential (a) In site area up to 500 Sq̤.m. | 3% | 6 % |
| (b) In site area above 500 Sq.m. | 5 % | 10 % | |
| 2 | Non-Residential (Commercial / Industrial / Other Uses) | 6 % | 12 % |
Note: Compounding fee shall be levied for the total area of ‘deviation in FAR’ or ‘total covered area of setback infringement in all floors’, whichever is higher.
Table-2D
Compounding Fee for condoning other type of Deviations
| Sl No | Details of Compounding Fee | Rate of Compounding Fee based on the guidance value of site, subject to a minimum consideration of Rs.50,000/- per sq.m. Chargeable for the buil̲t-up area constructed in violation of the Sanction Plan and but within permissible limits | Rate of Compounding Fee based on the guidance value of site, subject to a minimum consideration of Rs.50,000/- per sq.m. Chargeable for the buil̲t-up area constructed in violation of the Sanction Plan and but within permissible limits |
| Sl No | Details of Compounding Fee | Residential | Non Residential (Commercial / Industrial / Other Uses) |
| 1 | 2 | 3 | 4 |
| 1 | Extension of basement in violation of sanction plan | 7 % | 14 % |
| 2 | Built-up area in violation of sanctioned mezzanine floor area | 9 % | 18% |
| 3 | Balcony area in violation of sanctioned plan (subject to maximum of 25 % of total sanctioned Balcony area) 5 | 7 % | 14 % |
| 4 | Construction on Terrace in violation of Sanctioned plan (subject to maximum of 15 % of terrace area) | 9 % | 18 % |
| 5 | Built up area constructed other than FAR area and also BUA excluding Sl.No.(1) to (4) above | 5 % | 10 % |
| 6 | Area / Part of Building Occupied without obtaining Occupancy certificate | 0.15 % | 0.30 % |
| 7 | Building constructed within the ZR / Bye-law limits but without obtaining permission from the Competent Authority (shall be levied during issue of occupancy certificate) | 0.20% | 0.40% |